Please use this identifier to cite or link to this item: http://ir.juit.ac.in:8080/jspui/jspui/handle/123456789/7765
Full metadata record
DC FieldValueLanguage
dc.contributor.authorGarg, Puneet-
dc.contributor.authorJamwal, Suryabhan Singh-
dc.contributor.authorVerma, Ankur [Guided by]-
dc.contributor.authorGupta, Ashok Kumar [Guided by]-
dc.date.accessioned2022-10-13T09:30:20Z-
dc.date.available2022-10-13T09:30:20Z-
dc.date.issued2019-
dc.identifier.urihttp://ir.juit.ac.in:8080/jspui/jspui/handle/123456789/7765-
dc.description.abstractPROJECT BACKGROUND The Quality Assurance Plan (QAP) for: Widening & up-gradation of 2-lane with paved shoulders configuration & geometric improvement from 0+000 KM to 16+990 KM from Chenani to Sudhmahadev section of NH-244 in the state of Jammu & Kashmir on EPC mode. It is essentially intended to assist the project team to carry out the various project-related activities in conformity with Technical Schedules, IRC Standards, MORT&H Specifications and Terms of Reference (TOR) as given in the Contract Agreement. The overall aim of the QAP is to eliminate errors rather than detect errors so that deliverables are of required quality and can be submitted to the agreed time frame. All the activities of the project to be undertaken by the ECI-SRM PROJECTS will be based on the quality assurance system/procedures set out on the basis of the Technical Schedules, IRC Standards, BIS Specifications, MORT&H Specifications and Circulars, sound engineering practices and as approved by the MORT&H. The QAP is based on the existing Quality Policy and System Procedures prevalent in the organization and has been suitably modified to meet the specific project requirements. The QAP will ensure that all investigations are controlled from inception and controlled at appropriate levels and the data collected is authorized and approved before use. Similarly, all designs and reporting documentation will be subjected to the rigors of the QAP and ultimately approved by the Team Leader. Quality Assurance Procedures have been framed for the following activities covering the different stages of the project:en_US
dc.language.isoenen_US
dc.publisherJaypee University of Information Technology, Solan, H.P.en_US
dc.subjectQuality assurance planen_US
dc.subjectWidening and Upgradationen_US
dc.subjectPaved Shoulder Configurationen_US
dc.subjectGeometric Improvementen_US
dc.subject2 Laneen_US
dc.subjectNH-244en_US
dc.titleWidening and Upgradation to 2 lanes with paved shoulder configuration and geometric improvement on Chenani - Sudhmahadev section of NH-244en_US
dc.typeProject Reporten_US
Appears in Collections:B.Tech. Project Reports



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.