Please use this identifier to cite or link to this item:
http://ir.juit.ac.in:8080/jspui/jspui/handle/123456789/6347
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Sharma, Ayush | - |
dc.contributor.author | Rajta, Ankush | - |
dc.contributor.author | Singh, Lav | - |
dc.date.accessioned | 2022-09-22T09:15:12Z | - |
dc.date.available | 2022-09-22T09:15:12Z | - |
dc.date.issued | 2015 | - |
dc.identifier.uri | http://ir.juit.ac.in:8080/jspui/jspui/handle/123456789/6347 | - |
dc.description.abstract | This Project is an attempt to do road survey from Jaypee University Gate to 1.2km road stretch towards Waknaghat Circle. We have take 6 points at every cross section like extra Left Hand side ,Left hand side ,Centre Line ,Right hand side ,Extra Right hand side and Drainage with the help of Total station . We started our work from point which was very near to Jaypee University Gate, so we took that point as our benchmark. We try to find width of the pavement and shoulder width at every cross section with the help of total station .After this , we choose 10 curves from JaypeeUniversity Gate to 1.2km and for that curves we have calculated Radius of curve ,Stopping sight Distance (SSD),Overtaking Sight Distance(OSD) and others various Horizontal alignment components of road like Super elevation ,Extra widening of the curves and Minimum length of transition Curve by empirical formula for each curves . To find this, we first calculated Radius of curve through Versine curve method and after obtaining the radius of curves for 10 curves. We calculated other design parameters. After completing this objective, we learnt to operate MX road software. In MX Road software, we learnt how to convert Auto cad File in to MX file. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Jaypee University of Information Technology, Solan, H.P. | en_US |
dc.subject | Road development | en_US |
dc.subject | JUIT | en_US |
dc.subject | Rectile focus | en_US |
dc.subject | Concrete pavement | en_US |
dc.title | Rural Road Development from Jaypee University Gate to 1.2 Km Stretch Towards Waknaghat | en_US |
dc.type | Project Report | en_US |
Appears in Collections: | B.Tech. Project Reports |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Rural Road Development from Jaypee University Gate to 1.2 Km Stretch Towards Waknaghat.pdf | 4.34 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.