Please use this identifier to cite or link to this item: http://ir.juit.ac.in:8080/jspui/jspui/handle/123456789/5608
Title: Applicability of Public Private Partnership Model on Larji Dam Construction
Authors: Prashar, Rhishabh
Rawat, Saurabh [Guided by]
Gupta, Ashok Kumar [Guided by]
Keywords: Public private partnership model
Cost time relationship
Larji project
Genetic algorithm
Efficiency
Issue Date: 2018
Publisher: Jaypee University of Information Technology, Solan, H.P.
Abstract: Public-private partnership (PPP) model, if executed well, can help to conquer inadequate foundation that constrains commercial growth, especially in growing countries. Infrastructure properties are known to stimulate much-required growth in growing countries and lessen income disparities. Although inadequate infrastructure is often a consideration of numerous constraints governments face, for an example, inadequate public funds, poor preparation, weak judgment underpinning project determination, or corruption. Infrastructure assets are also usually prepared. P3 s can help to overcome few of these difficulties by mobilizing private field resources, helping develop project collection and on-time and on budget implementation, and securing adequate subsistence. Although initially, limited to public infrastructure in the construction of roads, railways, power production, or water and garbage processing facilities, P3s have frequently moved into the stipulation known as social infrastructures like institutions, hospitals, and fitness services. In this research work, we are taking into consideration the Larji project in Himachal Pradesh. It was found the total cost of the dam is 1500 crore .The project comprises of two data sheets one contains the work description and the second work sheet consist nodes and vendors of dam construction. The cost in crore is observed for the questions are searched in the question sheet then the answers are selected. After that the vendors are determined as per the cost of the construction and the vendor that has the lowest cost will get the contract of the project. The code is simulated in the MATLAB environment and each question is incremented in the answer options. By applying the Genetic Algorithm it was determined there is reduction in time as well as cost with increase in efficiency.
URI: http://ir.juit.ac.in:8080/jspui//xmlui/handle/123456789/5608
Appears in Collections:Dissertations (M.Tech.)

Files in This Item:
File Description SizeFormat 
Applicability of Public Private Partnership Model on Larji Dam Construction.pdf2.91 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.